|
Click on each photo to view a larger version.

Principal Gregory Jones speaking at the ribbon cutting
ceremony (left) and receiving a commemorative plaque
from the Executive Principal of CS Arch, Richard L.
Peckham (right).
 
Two views of the new cafetorium. This space was
previously used as a gymnasium and auditorium.
 
All classrooms have been renovated and fully updated.
 
A look at the front of the school and the new main office
on the first floor. This space was previously used as a
branch of the Albany Public Library.
 
Two looks at the new gymnasium.
 
An outside look at the newly constructed gymnasium (left)
and the hallway leading to the new gymnasium (right).
A look inside the new library (left) and another view of
the front of the building (right).

Views down the main staircase from the second (left) and
third (right) floors.
|